When will my land be ready?
Stage Progress
Estimated Titles
due Oct 2023
Estimated Settlement
due Nov 2023
Hakea Release: Lot 1901 – 1985
Stage 19
Civil Phase
-
EarthworksCompletedView Details
Earthworks involves the cutting, filling, movement, compaction or stockpiling of existing soil and/or the importation or removal of fill. Site re-grading is carried out to adjust the slope and elevation of the soil.
-
SewerCompletedView Details
Each block will be provided with the reticulated sewer services. These pipes are laid in a trench and the area is usually protected by an easement.
-
DrainageCompletedView Details
Underground drainage infrastructure is installed. This stormwater drainage system helps to move large bodies of water to water storage locations.
-
Road InfrastructureCompletedView Details
The first part of constructing the roads is the construction of earthworks and drainage works. This is followed by the construction of the road base, kerb, footpaths, driveways and other services prior to the placement of the asphalt.
-
Water + GasCompletedView Details
Gas, potable (drinking) and recycled water pipes are installed and each lot has a single connection point. The recycled pipe is easily identified as it is purple.
-
Electrical + TelecommunicationsCompletedView Details
Located within the verge is the trench that contains electrical cabling. Once this is completed, street lights can be installed. In addition, the fibre optic cable is installed and will be used to provide high speed broadband and telecommunications services to your home.
-
Construction completedCompletedView Details
The completion of the construction works.
Registration phase
A statement of compliance confirms that council is satisfied that all the requirements of the subdivision have been met by Risland.
The statement of compliance is forwarded to the land titles office with other documentation, which allows individual titles to be issued for every lot within the subdivision stage.